Maximize Boiler Heat Recovery with Condensing
2010-11-24u2002·u2002•Menex system installed on two 75,000 pph 800 psig saturated steam boilers • Steam Production – 95,000 pph summer – 130,000 pph winter • Installed after existing FW economizer • Preheat boiler make-up water to 135 F • Installed cost: $600,000 • Annual savings: $400,000 • Payback: 1.5 yrs Case Study: Direct Contact Condensing economizer Dial Corporation, Chicago area
Get Price